What the ordinance requires
Detroit's Energy and Water Benchmarking Ordinance asks owners of larger buildings to measure and report how much energy and water their building uses each year. The idea is simple: what gets measured can be compared, and what can be compared can be improved.
In practice, that means each covered building must gather a full year of utility data, enter it into the U.S. EPA's free ENERGY STAR Portfolio Manager tool, and submit the results to the City. No outside professional sign-off is required: Portfolio Manager's automatic data verification checks your data as you go.
The City's public dataset (Sept 2025) lists about 2,900 covered buildings, with only about 1 in 5 marked compliant (Source: City of Detroit open data). If you haven't filed yet, you're far from alone — but it's worth getting ahead of. The City's own page is the best place to confirm details: detroitmi.gov/benchmarking.
Each building's compliance status, size and age are published on the City's public transparency map, so you can see how your building (and your neighbors) appear.
Which buildings are covered
The Detroit benchmarking ordinance applies to:
- Privately owned commercial and multifamily buildings of 25,000 square feet or more. That includes offices, apartment buildings, retail, warehouses, medical office buildings, and larger churches and nonprofit buildings.
- City-owned buildings of 10,000 square feet or more.
Square footage means gross floor area, not counting parking. If you're unsure, try our Am I covered? tool for a quick estimate.
Exemptions
Buildings that are vacant, slated for demolition or under 25,000 sq ft may qualify for a whole-building exemption. Buildings with water or energy shutoffs in the past year may qualify for a data exemption. Owners request exemptions through the City's form, and we can help.
Deadlines
Reports are due June 1 every year and cover the previous calendar year. For example, the June 1, 2027 filing covers January–December 2026 data.
Because utilities and tenants can take weeks to respond, we recommend having your information gathered by April 1. That leaves room to fix any data issues before the June 1 benchmarking deadline in Detroit.
What data you need
You'll need 12 months (January through December) of whole-building data for each energy and water source the building uses:
- Electricity — usually DTE Energy.
- Natural gas — DTE Energy or Constellation.
- Steam — Detroit Thermal, if the building uses district steam.
- Water — the Detroit Water and Sewerage Department (DWSD). Water is usually billed in thousand gallons, so match the unit on your bill when you enter it.
Automating DTE data through the Energy Data Hub starts with joining the Detroit 2030 District; you can also enter 12 months of bills manually.
You'll also need building basics: address, year built, gross floor area excluding parking, occupancy and how the space is used.
How to find your Detroit Building ID
The Detroit Building ID (DBID) is the City's unique ID for your building. It's entered in Portfolio Manager so the City can match your report to the right property. Without it, your submission may not count.
You can look up your building's ID with the City's tool: Detroit Building ID lookup. Search by address and note the ID for each building you own or manage.
Using ENERGY STAR Portfolio Manager
ENERGY STAR Portfolio Manager is the EPA's free online tool for tracking building energy and water use. At a high level, benchmarking in Portfolio Manager looks like this:
- Create an account and add the property, with its floor area and use type.
- Enter the Detroit Building ID in the property's details.
- Add a meter for each utility and enter (or connect) 12 months of data.
- Run the built-in data quality checker and fix any gaps or outliers.
- Share the property with the City: search for the username "DetroitSustainability" (it appears as "Detroit Benchmarking Reporting"), then share with Bulk Sharing and Exchange Data Full Access.
For many Detroit property managers, the trickiest part of using ENERGY STAR Portfolio Manager is not the tool itself — it's getting clean, complete data into it.
Tenant consent forms for DTE whole-building data
DTE can provide whole-building, aggregated data so you don't need every tenant's individual bill. But if tenants pay their own utilities and the building has fewer than five tenants, DTE needs each tenant's signed consent before it releases the data.
Collecting those forms — and following up on them — is often the slowest step. Plan for it early.
What happens if you don't comply
Right now the City is in an amnesty period and isn't issuing fines. But every covered building's compliance status is on the City's public map, updated weekly, and lenders, buyers and tenants check it. Fines are expected once the amnesty ends. Filing each year keeps your building in good standing on that map.
Do it yourself vs. hire help
To be fair: you can absolutely do this yourself. Portfolio Manager is free, and the City publishes guidance. If you manage one building with a single utility account and no tenant-paid utilities, a careful afternoon or two may be enough.
Most managers hire help when they have several buildings, tenant-paid utilities, or steam service. Collecting utility data and tenant forms takes time, and mistakes can mean refiling. A service like ours trades a flat fee for that time and risk.
How Lakeline can help
Lakeline handles benchmarking compliance in Detroit end to end: collecting 12 months of utility and water data, chasing tenant consent forms, setting up and cleaning up Portfolio Manager, running Portfolio Manager's data quality checks on every building, submitting to the City and sending you a one-page summary.
Pricing is flat and per building — see our pricing. Start with a free compliance check and we'll tell you exactly where your building stands.